Replacement of power transformer T-1 at the 110/10 kV Palemonas transformer substation
AB "Energijos skirstymo operatorius"
UAB Ekobana, acting as a contractor, carried out the replacement of power transformer T-1 at the 110/10 kV Palemonas transformer substation, supplied the equipment, and prepared a detailed design.
THE SCOPE OF THE CONTRACT:
- Preparing the detailed design
- Disassembly of the old 110/10 kV 16 MVA power transformer, its transportation to the facilities of AB ESO and conservation
- Delivering a new 110/10/10 kV 25 MVA power transformer, its assembly, and testing
- Commissioning works
UAB Ekobana fulfilled the contract within budget and strictly in accordance with all the technical conditions laid down in the contract.
2017
year started8
month implementation deadline2017
year of project delivery